Re: Rep Retirement Lodge #153: Condiments, anyone?
Well, today at work was.....interesting. Offsite is getting more racking/frames built. It came in today, filling 2 52' semitruck trailers. Also, with the inbound trailer, that meant that 3 of our 4 dock doors were taken up the entire day, instead of just one. We have five carriers use the dock doors within about 90 minutes at the end of the day. There's hassle #1.
The frames were placed outside in the lot (lack of room inside). The racking.....well, half the racking toppled over in the trailer when the metal banding snapped, meaning the bosses had to handstack six 8-foot pallets of racking (each pallet was about 4 feet high with racking), extending the unloading time by about 3 hours, plus making my offsite co-worker and I stage our outbound stuff in other various areas, since the restacking was done in our normal staging area. Hassle #2.
Finally, in their infinite wisdom, the bosses let 3 of our 8 forklift jockeys (main building) have vacation today (normally, no more than 2 people have the same day off at the main building, and almost NEVER 2 forklift jockeys on the same day, due to business needs. So, yep, another late night. Hassle #3.
So, I think I'll pour me a drink.