Stopped at HFH today. It appears that boards are arriving -- there are board sections on pallets inside the building, visible from the open door I was peering into.
I couldn't tell if all of the boards and glass were on site, but its progress at the least.
There is a local contractor crew working to demo the old wooden gym flooring in the concession area, so that section will be getting new flooring of some sort.
Out back, the refrigeration system remains a work in progress --they have some rental equipment on trailers (one tank unit and another with a large diameter hose attached. ) There was water being circulated / pumped out of the system and into the surface of the rear parking area.
Seeing as how we are now 12 business days away from the women's home opener and still have no boards or ice, I think the possibility of HFH being ready in time is remote....would love to be proven wrong !!