umhockey91
Well-known member
They are breaking ground for Morse Arena this winter.....actually I've heard that it will happen after the Nov.1 football game. It will be located in the South Endzone area and the parking lot behind it. That lot on the left hand side driving toward the field house will no longer exist. The budget will be in the $80-$90 million range. Only 2,500ish seats.....a bit on the small side for the amount they are spending IMO.Have they started the new bball arena and where is it?
Parking already is an issue.....this will exacerbate that problem. Whenever a new parking structure is mentioned....people chime in that Marsh Island is sinking and it is impossible to build on campus despite all of these new buildings being constructed. It is 2025 and UMaine has an incredible engineering school.....I'm sure they can figure out how to build a 3 level parking structure.....lol.
Last edited: