St. Clown
Liberal Rebel Scum, apparently
Re: Gear Grinding 8: I Got A Lot Of Problems With You People!
My old boss liked to say that we were agile when running iterative projects. Really, we were closer to waterfall due to tech doc requirements surrounding tight audit needs, but allowed for some tweaks if the dev team thought they could handle them without blowing up the project's timeline.
How about anyone that claims they're doing Agile? 99.999% of them aren't.
My old boss liked to say that we were agile when running iterative projects. Really, we were closer to waterfall due to tech doc requirements surrounding tight audit needs, but allowed for some tweaks if the dev team thought they could handle them without blowing up the project's timeline.